Period: - • Data source: Embedded / uploaded Excel
Executive Material Risk Position
Board-level snapshot: where the stock risk is, what action is required, and which material needs escalation.
Material Stock Risk Matrix
BOD Decision Focus
Stock Level by Material
Cover Days by Material
Projected D+30 Cover Days
Projection Assumption Snapshot
Editable Board Action Plan
Coal — Supply Continuity
Separate view for coal stock, consumption, received volume, HHV and unit consumption pattern.
Coal Consumption vs Received
Coal Stock & Cover Days
Coal Unit Consumption
Coal HHV Trend
Coal Projected Consumption / Incoming — Next 30 Days
Coal Projected Stock — Next 30 Days
Coal Board Recommendation
Silica Sand — OH Readiness & Recovery
BOD view for silica replacement requirement after overhaul, daily top-up, and recovery from boiler drain/manual sieving.
OH Plan Input
Silica Recovery Input
Operating Logic
After OH, fresh silica requirement is normally 100 ton. Daily silica consumption is treated mainly as top-up. Boiler drain silica is sieved manually and monitored as recovery stock.
Silica Filling/Top-up vs Received
Silica Stock vs OH Requirement
Silica Projected Usage / Incoming — Next 30 Days
Silica Projected Stock — Next 30 Days
Silica Board Recommendation
LFO — Emergency & Start-up Readiness
BOD view for LFO reserve, usage split, replenishment and cover days.
LFO Usage Split
LFO Stock & Cover Days
LFO Projected Consumption / Incoming — Next 30 Days
LFO Projected Stock — Next 30 Days
LFO Board Recommendation
Limestone — Reagent Availability
BOD view for limestone stock, filling and reagent continuity.
Limestone Filling vs Received
Limestone Stock & Cover Days
Limestone Projected Consumption / Incoming — Next 30 Days
Limestone Projected Stock — Next 30 Days
Limestone Board Recommendation
Threshold & Editable Action Plan
Manual setting for material status level. Thresholds are stored locally in the browser.
Safety Stock / Cover Days Threshold
Projection Assumption — Next 30 Days
Default projection uses selected-period daily consumption and trailing 3-month average incoming. Manual override can be entered for BOD scenario discussion.