PT Tanjung Power Indonesia

BOD Material Stock Dashboard

Executive boardroom view for coal, silica sand, LFO, and limestone — focused on stock risk, supply continuity, readiness, and decision action.
Cloud: not loaded
Admin mode: setelah upload/edit, klik Save Dashboard Data agar terlihat oleh semua reader.
Selected period: - Embedded data Trend range: 1 Year

Executive Material Risk Position

Board-level snapshot: where the stock risk is, what action is required, and which material needs escalation.

-

Material Stock Risk Matrix

BOD Decision Focus

Stock Level by Material

Cover Days by Material

Projected D+30 Cover Days

Projection Assumption Snapshot

Editable Board Action Plan

Coal — Supply Continuity

Separate view for coal stock, consumption, received volume, HHV and unit consumption pattern.

-

Coal Consumption vs Received

Coal Stock & Cover Days

Coal Unit Consumption

Coal HHV Trend

Coal Projected Consumption / Incoming — Next 30 Days

Coal Projected Stock — Next 30 Days

Coal Board Recommendation

Silica Sand — OH Readiness & Recovery

BOD view for silica replacement requirement after overhaul, daily top-up, and recovery from boiler drain/manual sieving.

-

OH Plan Input

Silica Recovery Input

Operating Logic

After OH, fresh silica requirement is normally 100 ton. Daily silica consumption is treated mainly as top-up. Boiler drain silica is sieved manually and monitored as recovery stock.

Silica Filling/Top-up vs Received

Silica Stock vs OH Requirement

Silica Projected Usage / Incoming — Next 30 Days

Silica Projected Stock — Next 30 Days

Silica Board Recommendation

LFO — Emergency & Start-up Readiness

BOD view for LFO reserve, usage split, replenishment and cover days.

-

LFO Usage Split

LFO Stock & Cover Days

LFO Projected Consumption / Incoming — Next 30 Days

LFO Projected Stock — Next 30 Days

LFO Board Recommendation

Limestone — Reagent Availability

BOD view for limestone stock, filling and reagent continuity.

-

Limestone Filling vs Received

Limestone Stock & Cover Days

Limestone Projected Consumption / Incoming — Next 30 Days

Limestone Projected Stock — Next 30 Days

Limestone Board Recommendation

Threshold & Editable Action Plan

Manual setting for material status level. Thresholds are stored locally in the browser.

Safety Stock / Cover Days Threshold

Projection Assumption — Next 30 Days

Default projection uses selected-period daily consumption and trailing 3-month average incoming. Manual override can be entered for BOD scenario discussion.

Board Action Plan Editor